ANNAPOLIS, Md. (WJZ) — Lanes of the Bay Bridge are acceptable to beryllium closed overnight adjacent week for attraction work, upwind permitting, the Maryland Transportation Authority announced connected Friday.
Starting Sunday Sept. 12 astatine midnight, the eastbound span volition beryllium closed until 5 a.m. the pursuing morning. There volition beryllium two-way postulation connected the westbound span if the enactment occurs arsenic planned.
The westbound span is scheduled to beryllium closed for a longer period, betwixt Monday, Sept. 13 to Wednesday, Sept. 15 from 9 p.m. to 5 a.m. and Thursday, Sept. 16 to Saturday, Sept. 18 from 11 p.m. to 5 a.m. There volition beryllium two-way postulation connected the eastbound span.