Crane Delivery Heading To Baltimore To Stop Traffic At Bay And Key Bridges Thursday

3 years ago 393

September 8, 2021 astatine 10:00 am

BALTIMORE (WJZ) — There volition beryllium impermanent postulation holds Thursday astatine the Bay and Key bridges for a crane shipment that is heading to Baltimore.

The MDTA volition clasp postulation successful some lanes connected the Bay Bridge astatine 10 a.m., and they volition clasp some lanes of postulation astatine the Francis Scott Key Bridge astatine 12 p.m. Thursday. Each closure volition beryllium from 15-30 minutes.

READ MORE: Safe Streets Group In Belair-Edison Receives $100K Grant From Everytown For Gun Safety

There volition beryllium a transition of vessels carrying 4 ample cranes, and the MDTA is closing the bridges to guarantee that drivers aren’t distracted by the shipment.

READ MORE: COVID-19 In Maryland: Over 200 In ICU Beds, 21 Deaths In Last 24 Hours

The closure times are babelike connected the vessel’s advancement and weather.

MORE NEWS: Teen Shot In The Head By Possible Stray Bullet In Baltimore

For real-time updates, follow the MDTA Twitter oregon presumption the provender from their homepage astatine mdta.maryland.gov.

Read Entire Article